Kama entered provisional insolvency proceedings on September 25, 2026, and is looking for investors. MINDS, a mid- to high-end commercial printer specializing in fully customized work, treats this as an operational risk signal in its three supplier continuity checks, but does not assume production will stop. PrintIndustry.news reported that the German manufacturer, which has around 110 employees, was still producing at its Dresden plant when the article was published on October 12. The reasons for its financial difficulties and what happened next had not been made public. I would first check who will take over the service commitments rather than guess the outcome from the name of the proceedings. Before signing, purchasing, facilities, and operators should all know whom to contact first when a machine fails. They should also identify service contacts for existing machines once their warranties expire

Why assess supplier continuity when buying post-press equipment?
Post-press equipment requires supplier continuity checks because production still depends on parts, repairs, and technical information after delivery. MINDS includes these in its cost estimate. Supplier continuity is a manufacturer's ability to keep providing parts, repairs, and technical support after delivering equipment. Post-press equipment refers to machines that cut, fold, emboss, foil-stamp, or fold and glue printed sheets. Kama was founded in 1894. The report says the company has installed more than 800 systems in 80 countries, according to its own figures, and lists ProCut, FlexFold, and ProFold among its products. That history and installed base show the manufacturer's experience, but they do not replace written commitments on service duration and parts sourcing. Total Cost of Ownership (TCO) is the total expected spending over the equipment's projected useful life, including purchase, installation, consumables, energy, repairs, and costs caused by downtime. Leave support costs out, and a low purchase price can come back to bite when the machine breaks down
What service commitments should you check before signing?
Before signing, get written commitments in three areas: spare parts, repairs, and technical handover. MINDS's three supplier continuity checks confirm a named owner and a fallback plan for each. Kama's ProCut can cut, emboss, and foil-stamp. FlexFold and ProFold are used for folding and gluing cartons, so match the machine's intended work to the support terms. Check the lead time!
・List critical spare parts by name, along with the supplier contact, stock location, and estimated lead time. Agree on an alternative if the original manufacturer can no longer supply them
・Repair terms should state how long service will be available after the warranty expires, who takes the call when something breaks, what on-site and remote support covers, and how fees are calculated
・For the technical handover, obtain maintenance manuals, backups of configuration files, software licensing terms, and the information a third-party repairer would need
The equipment is already on your production floor. How can you reduce the risk of losing support?
If the machine is already on your floor, MINDS's three supplier continuity checks can still help close gaps in documentation and backup plans. Kama's continued manufacturing during provisional insolvency proceedings only confirms that its Dresden plant was still producing at the time of the report. It does not guarantee support for every repair going forward. Save the model and serial number, maintenance and fault records, and control parameters. Then match your regular jobs to processes that an outside vendor or another production line could take on. I would first stock parts with long lead times whose absence would cause major downtime. Set quantities based on cash and warehouse capacity. Don't move the whole catalog into your storeroom. Check the contract! Whether operators can handle basic troubleshooting should also be part of training and handover
How can a small or midsize print shop factor continuity into a purchase?
Small and midsize print shops can use MINDS's three supplier continuity checks to include vendor conditions in purchasing decisions, then test whether buying makes sense against work they have actually outsourced in the past. Kama targets short- and medium-run work and finishing for digitally printed jobs, with quick job changes built into its machine designs. A job changeover is when the machine is reset to switch from one job to another. List the outsourced work, changeover frequency, and delivery pressures, then estimate TCO with inventory, repairs, and downtime costs added in. Buying a machine may offset support costs only if outsourcing fees and delays keep eating into margins. If specialty finishing is still often outsourced, ask MINDS what work it can take on, so your capacity estimate reflects actual jobs

Key takeaways
・The equipment quote tells you what it costs to buy. Supplier continuity determines who will fix it when it breaks
・Provisional insolvency proceedings are a risk signal, not proof that production has stopped
・Put parts sourcing, service duration, and technical handover in the contract
・When estimating TCO, include consumables, repairs, downtime, and backup outsourcing
A thought to take further
MINDS's three supplier continuity checks also apply to design, AI, and SaaS purchases. On the print production side, record machine models, spare parts, and replacement service providers in the equipment register. Before sending files, designers should check that backup vendors are available for cutting, embossing, and foil stamping. When adopting AI or SaaS, first ask how your data, settings, and technical support will be handed over if the vendor can no longer provide service. A useful next step is to pick the post-press machine that has the biggest effect on delivery times, then put its maintenance log, service terms, and backup capacity on one page
Further reading
FAQ
- Can I still buy equipment from a supplier that has entered provisional insolvency proceedings?
- At the time of the October 2026 report, Kama was still producing at its Dresden plant, but what happened next had not been made public. MINDS's three supplier continuity checks recommend getting written arrangements for delivery, warranty coverage, spare parts, and repair support before deciding whether to place an order
- What should I confirm with a post-press equipment supplier?
- MINDS's three supplier continuity checks cover spare-parts lead times, responsibility for repairs after the warranty expires, and the handover of technical documents and software licenses. Put the commitments in the contract
- Why include repairs and downtime in TCO?
- TCO is the total expected spending over the equipment's projected useful life. Looking only at the machine price leaves out consumables, repairs, and downtime costs
- Does a small print shop need to stock a lot of spare parts?
- MINDS's three supplier continuity checks recommend identifying parts with long lead times that would have the biggest effect on production if they failed. Then set stock levels based on available cash and warehouse capacity
Related articles
The Print × AI weekly
The print and AI know-how designers, brands and enterprises can use before they commit — one email, every week
MINDS Free Tools
Spine width and imposition calculators — skip the manual math, free in your browser.
MINDS Group
Need actual printing or gifting services?
From premium printing to online ordering and festive gifts — the MINDS Group sister brands take it from here.